啊轻点灬大ji巴太粗太长了嫲嫲,ww污污污网站在线看com,成人免费777777被爆出,亚欧AV不卡第一区二区

NHI Headlines

On April 8th morning, along with a "rumble" roar, NHI "Cooperation 2" Tunnel Boring Machine (TBM for short) started tunneling at the 17m underground construction site of Culture West Road Station of metro line 10. Compared with other TBM, this TBM made by NHI is more humane with reasonable spatial distribution and its cutter parameters are more suitable for Shenyang soil. "Cooperation 2" TBM complete the installation of 20 ring segments within 24 hours.